Case History - Four Seasons Hotel, Whistler, BC, Canada

The Four Seasons Hotel in Whistler, BC represents the type of complexity of detail drawings that JP Drafting is capable of producing. The steel structural portion was mainly limited to the roof. This roof was a complex combination of compound angles creating gables, hexagons, steep pitches and multiple roof lines.

This project represents the complexity of detailing that JP Drafting is capable of producing.

The project was commenced and completed in 2003. It spanned 5 months and 12 phases, from grid line to grid line by a large team of detailers.

Below we illustrate some of the details, showing connections, elevations, 3D models and the final drawings. Click on thumbnail to open large detailed drawing.

Phase 1 - 3D View - Outline

Phase 1 - 3D View - Rendered


Anchor Bolt Layout Elevation

Phase 1 - Steel Layout


Elevation & Erection Drawing

3D Rendering - Roof Section


Assembly Drawing - Beam

Assembly Drawing - Connection


Single Part Drawing

3D Rendering - Connection


Your Projects - Detailed By JP Drafting

  • Four Seasons Hotel, Whistler, BC, Canada
  • St. Paul’s Hospital, Vancouver, BC, Canada
  • Cordova Viaduct, Vancouver, BC, Canada
  • Tower 1e Residential, Vancouver, BC, Canada
  • Richmond Hotel, Richmond, BC, Canada
  • Cascadia Terminal, Vancouver, BC, Canada
  • Dino - 2000, Drumheller, Alberta, Canada
  • Bayshore Shoreline, Vancouver, BC, Canada
  • Allied Blower Silo Project, 100 Mile House, BC, Canada
  • Crofton Mill, Crofton, BC, Canada
  • Lower Canada College, Montreal, Quebec, Canada
  • Salt Radial Stacker, Vancouver, BC, Canada
  • The Hilton, Richmond, BC, Canada
  • Le Soliel Hotel, Vancouver, BC, Canada
  • The Lions, Vancouver, BC, Canada
  • The Marriotte, Richmond, BC, Canada